ANSI MH16.1 is the American National Standard for the design, testing and use of industrial steel storage racks, published by the Rack Manufacturers Institute (RMI). The current edition is MH16.1-2023. The International Building Code requires steel storage racks to follow it, so it shapes your rack’s engineering, anchoring, load capacity plaques and permit. Your city enforces the edition its adopted building code references, which may be older.
Key Takeaways
- MH16.1 covers selective pallet rack, pushback, pallet flow, carton flow, pick modules, rack-supported platforms and AS/RS racks. Cantilever and drive-in racks are not covered.
- IBC Section 2209.1 makes MH16.1 the rack design standard, which is how it becomes enforceable.
- The 2021 IBC references MH16.1-2012 and the 2024 IBC references MH16.1-2021, so check which code your city has adopted.
- MH16.1 Section 4.5 sets what a load capacity plaque must show, and plaques should be at least 50 square inches.
- Columns more than 1/240 out of plumb (1/2 inch per 10 feet of height) should be unloaded and corrected.
The rack permit comes back from plan review with one line circled: “Provide calculations per ANSI MH16.1.” Or two quotes land on your desk, and only one says “designed to MH16.1-2023.” Either way, you’re being held to a standard most warehouse managers have never seen, because it’s a paid engineering document written for rack designers.
You don’t need to read all of it. You need to know what ANSI MH16.1 covers, which edition your city enforces, and which parts show up on your floor: the plaques, the anchors and how straight your columns stand.
This guide covers those, plus how the standard fits with OSHA and your permit. For the wider picture of OSHA, fire code and permit rules, start with our guide to warehouse racking requirements.
What is ANSI MH16.1?
ANSI MH16.1, Design, Testing, and Utilization of Industrial Steel Storage Racks, is the American National Standard for steel storage racks. RMI writes it, and the current edition, MH16.1-2023, was listed by MHI in April 2023.
It sets minimum requirements for how racks are engineered, tested and used. Rack structures are designed with Allowable Strength Design (ASD) or Load and Resistance Factor Design (LRFD), with cold-formed steel parts calculated to AISI S100 and hot-rolled parts to AISC 360, as ANSI summarizes the 2023 edition.
In plain terms, it’s the rulebook rack engineers and manufacturers design to. As the owner, you meet it in four places: the load plaque at the end of the row, the anchors at every column, the plumb of your columns, and the calculations in your permit file.
Which racks does MH16.1 cover, and which does it exclude?
MH16.1 applies to industrial steel storage racks built from cold-formed or hot-rolled steel, including movable-shelf racks and rack-supported systems. It does not apply to drive-in or drive-through racks, cantilever racks, portable racks or racks made of other materials, per the standard’s scope on ICC Digital Codes.
| Rack type | Design standard |
| Selective pallet racking | ANSI MH16.1 |
| Pushback rack | ANSI MH16.1 |
| Pallet flow rack and carton flow racking | ANSI MH16.1 |
| Pick modules and rack-supported mezzanines | ANSI MH16.1 |
| AS/RS racks (“stacker racks”) | ANSI MH16.1 |
| Cantilever racking system | ANSI MH16.3 (2025 edition) |
| Drive-in rack and drive-through rack | Not covered by MH16.1 |
| Pallet rack wire decking | ANSI MH26.2-2023 |
| Stairs, ladders and guards serving racks | ANSI MH32.1 (IBC Section 2213.1) |
Sources: MHI standards listings, 2024 IBC Chapter 22, and RMI on the MH16.3-2025 release.
Mixed systems bring more than one standard into a single permit. At ABC Supply in West Sacramento, we planned 61 selective pallet rack frames (12 ft) and 18 single-sided cantilever uprights (16 ft) as one job, engineered under one stamped structural package to Seismic Design Category D. Under IBC Section 2209.1, the pallet rack follows MH16.1 and the cantilever follows MH16.3.
Which edition of ANSI MH16.1 applies to your project?
The newest edition isn’t always the one you’re held to. MH16.1 becomes enforceable because IBC Section 2209.1 requires steel storage racks to be designed, tested and used in accordance with it. Each IBC edition references a specific MH16.1 edition, and your city enforces the IBC edition it has adopted, sometimes with local amendments.
| Building code your city adopted | MH16.1 edition it references | What it means for your racks |
| 2021 IBC | MH16.1-2012 | Older effective length method |
| 2024 IBC | MH16.1-2021 | Direct analysis method; designs can change in higher seismic areas |
| Not yet in a published IBC | MH16.1-2023 (current) | Newest edition; keeps the direct analysis method |
Source: RMI, Updated Methodology for Seismic and Stability Calculations, July 2024.
Before you order racks or re-rack, get three answers on paper:
- Which IBC edition and local amendments your building department enforces.
- Which MH16.1 edition your rack supplier’s calculations follow.
- Whether your project needs seismic design, which IBC Section 2209.2 sends to ASCE 7 Section 15.5.3.
What changed between the 2012 and 2021/2023 editions?
The biggest change is how engineers check a rack’s stability. MH16.1-2012 used the effective length method, a simplified first-order analysis that applied one down-aisle effective length factor of K=1.7 to an upright column. MH16.1-2021 introduced the direct analysis method, and the 2023 edition keeps it. It’s a second-order analysis that applies small horizontal “notional loads” at each shelf level and allows K=1.0, as RMI explains.
The new calculations also take in more of your actual system. RMI lists the added inputs: the average-to-maximum load ratio, beam-to-column connector stiffness and strength, beam and column stiffness, base plate and anchorage details, site seismicity, the number of storage levels, the frame’s height-to-depth ratio, and whether the racks sit in a warehouse or a retail store.
What it means for you:
- Cost can change. In areas with a higher likelihood of earthquakes, RMI notes the new method may produce a heavier rack design, which could raise the cost of the system.
- Older racks aren’t automatically unsafe. RMI says owners shouldn’t be concerned that racks designed under earlier editions are no longer safe.
- Changes need new numbers. Moving or removing a beam level changes capacity, so RMI says to work with a qualified rack design professional before you reconfigure.
What does MH16.1 require you to see on the warehouse floor?
Most of MH16.1 is engineering math. Four parts of it are things you or an inspector can check by walking the aisles.
What must a load capacity plaque show?
Load capacity plaques are governed by MH16.1 Section 4.5, according to RMI’s guidance on load capacity plaques. Post them on or near the rack where operators can see them, at least 50 square inches in size. A plaque shows:
- The maximum permissible unit load (product plus pallet) and/or the maximum load per level.
- The average unit load, if the design uses one.
- The maximum total load per bay.
- The number and spacing of storage levels in the original design.
When beam levels move, the plaque has to be updated to the new engineered configuration. We stock load capacity labels, and our rack labeling guide covers where they go.
How far out of plumb can a rack column be?
No more than 1/240 of its height. RMI explains that MH16.1 sets 1/240 as the limit for both out-of-plumb (leaning) and out-of-straight (bowing) columns. That’s 1 inch per 20 feet of height, or 1/2 inch on a 10-foot frame.
Columns past that limit should be unloaded and corrected, and because the lean often comes from damage, damaged parts should be repaired or replaced right away.
One exception: the IBC allows an out-of-plumb installation when the rack engineer designed the frames for it, such as racks on a sloped slab. Our guide to signs of pallet rack damage shows what a leaning or bowed column looks like.
Does MH16.1 limit rack height to 6 times its depth?

No. The 6 to 1 figure is a trigger for extra anchoring, not a height limit. Section 8.1 of MH16.1 has engineers check the height-to-depth ratio of a single row of rack: height from the floor to the top load beam, divided by frame depth measured outside column to outside column, per RMI’s height-to-depth guidance.
| Height-to-depth ratio | What MH16.1 calls for |
| 6 to 1 or less | Normal floor anchoring provides enough stability |
| More than 6 to 1 | Anchors and base plates designed to resist a 350 lb overturning force at the top beam level |
| More than 8 to 1 | Overhead cross-aisle ties recommended, with anchoring certified by an engineer |
These ratios apply to single rows. Back-to-back rows are tied together with the right type and number of row spacers instead.
Does MH16.1 require anchors and base plates?
Yes. MH16.1 requires a base plate on every column, and RMI says all pallet rack columns should be anchored to the floor, interior and rear columns included. The rack manufacturer or engineer specifies the anchor brand, size and quantity, and which base plate holes to use.
Our post on does pallet racking need to be bolted down walks through the OSHA citations, and we stock pallet rack anchors for existing racks.
In earthquake country, the anchors get inspected too. Under IBC Section 1705.13.7, steel storage racks 8 feet or taller in Seismic Design Category D, E or F need periodic special inspection, and the inspection table cites MH16.1 Section 7.3.2 for anchorage installation.
Does OSHA enforce ANSI MH16.1?
Not directly. OSHA has no standard written for storage racks. Its general rule for stored material, 29 CFR 1910.176(b), says materials must be “stable and secure against sliding or collapse.”
For rack hazards, OSHA also uses the General Duty Clause, and it has pointed to MH16.1 as the fix. In a 2022 citation at a wine and spirits warehouse, OSHA told the employer to follow ANSI MH16.1-2012, the edition the 2021 IBC references.
Your city is the more direct enforcer, through the building code and the permit. Our warehouse racking requirements guide breaks down the OSHA side in full.
How does ANSI MH16.1 show up in a rack permit?
Cities usually ask for racks to be designed to ANSI MH16.1 and ASCE 7, as our rack permit page explains. A typical submittal and close-out runs like this:
- A rack layout drawing showing the building, aisles and rack runs.
- Engineered calculations to MH16.1, with seismic design to ASCE 7 Section 15.5.3 where ASCE 7 requires it.
- Anchor details for every base plate.
- Special inspection of the anchors for racks 8 feet or taller in Seismic Design Category D, E or F.
- A certificate of compliance to the owner for racks 8 feet or taller to the top load level in Seismic Design Category D, E or F (IBC Section 2209.3).
- Final inspection, then loading within the posted plaque ratings.
Plan for 2 to 3 months from gathering drawings to final permit. On our Parr Lumber project in Damascus, Oregon, our structural engineer of record signed and sealed the calculations and permit drawings to Seismic Design Category D under the 2021 IBC and ASCE 7-16. The system passed final building inspection with the inspector’s note: “Racking appears per plan.”
Our engineers prepare seismic calculations for permit submittals, and our guide to pallet rack seismic compliance covers the earthquake side from permit to daily use.
ANSI MH16.1 FAQs
Is ANSI MH16.1 mandatory?
Yes, where your building code adopts it. IBC Section 2209.1 requires steel storage racks to follow ANSI MH16.1, so in a city that uses the IBC it is part of the building code. OSHA doesn’t adopt it directly, but it has pointed to MH16.1 in citations.
What is the latest version of ANSI MH16.1?
The latest edition is ANSI MH16.1-2023. It keeps the direct analysis method introduced in MH16.1-2021. Your city may still enforce an older edition, depending on which IBC it has adopted.
Does ANSI MH16.1 apply to cantilever racks?
No. Cantilever racks fall under ANSI MH16.3, which was revised in 2025. MH16.1 also excludes drive-in and drive-through racks, portable racks and racks made of materials other than steel.
Where can I get a copy of ANSI MH16.1?
MHI sells ANSI MH16.1-2023 for $150, and the ANSI Webstore lists it as well. ICC Digital Codes hosts the 2021 edition.
Do I need to replace racks designed to an older MH16.1 edition?
No, not for that reason alone. RMI says owners shouldn’t assume racks designed under earlier editions are no longer safe. A change to the system, such as moving beam levels or relocating the racks, is the time to have an engineer check it against the edition your city enforces today.
What should you do next?
Three things matter most. ANSI MH16.1 is the design rulebook for steel storage racks, and the IBC makes it enforceable. Your city decides which edition applies through the building code it has adopted. And your part on the floor is clear: posted plaques, anchored columns, plumb frames and no unapproved changes.
If you’re planning new racks, re-racking or relocating, send us your layout and your city. We’ll prepare the MH16.1 and seismic calculations, handle the permit, and schedule a rack safety inspection for the racks you already have. Call 503-640-5666.