cantilever rack design guide thumbnail

Cantilever Rack Design: Spacing, Height and Aisle Layout

Cantilever rack design in six steps: upright spacing, arm length, upright height, bracing and aisle layout, plus the code checks that decide if you need a permit.

  • 0
  • 15
  • 0
  • 15

CONTENTS

    Not Sure How This Applies to Your Business?

    icon blcok
    503-640-5666

    or

    Cantilever rack design starts with the load, not the rack. Measure the longest piece, its depth and the weight per level, then set upright spacing so the load doesn’t sag, choose arms at least as long as the load is deep, and stack levels to find column height. Finally, plan the aisle for the truck that loads it and check whether your height triggers a permit or fire-code review.

    Key Takeaways

    • Design from the load: its length, depth, weight per level and how much it bends.
    • Upright spacing comes from load length and sag. Start at half the load length, then add arms until the load stays flat.
    • Arms must be at least as deep as the load, and the load’s center can’t sit past the middle of the arm.
    • Upright height is the base plus every load, clearance and arm, and the column has to rise above the top arm.
    • Tall combustible storage brings in fire-code aisle rules and, in many cities, a rack permit.

    The bundles have been on the ground for months. Twenty-foot lengths of pipe and lumber lie in rows across the yard, and every pick means moving three stacks to reach the fourth. You know cantilever racks are the fix. Then the quote request asks how many arms you need, how far apart the uprights go and how tall the rack should be, and nobody has an answer.

    Cantilever rack design isn’t hard, but it has an order. The load sets the spacing, the spacing sets the arms, the arms and levels set the height, and the height and trucks set the layout. Get them in the wrong order and you end up with arms that bend, uprights that are too short, or an aisle the forklift can’t turn in.

    This guide walks through that order in six steps, shows the code checks that decide whether you need engineering and a permit, explains what the 2025 edition of the cantilever rack standard changed, and maps each decision to parts you can order.

    What do you need to know before you design a cantilever rack?

    Every cantilever rack design starts with a description of the load. The Rack Manufacturers Institute (RMI) says a rack engineer designs the base, uprights and arms from the details of the products the rack will hold: their sizes, dimensions, weights and how rigid or flexible they are. Gather these before you sketch anything:

    InputWhy it matters
    Material type and shapeRound stock rolls, sheet goods sag, bundles shift. Shape decides arm type and accessories.
    Longest and shortest lengthSets upright spacing and the length of each run.
    Load depth and heightDepth sets arm length. Height sets the space between levels.
    Weight per bundle and per levelChecked against the arm and upright ratings.
    How much the load bendsFlexible loads need more arms and closer spacing.
    Number of levelsDrives upright height and total upright load.
    Single-sided or double-sided accessDecides whether the rack runs along a wall or stands in open floor.
    Handling equipmentForklift, side loader or crane sets aisle width and lift height.
    Floor area, clear height, indoor or outdoorCaps the footprint and height, and sets finish, anchoring and weather loads.

    The same list sits at the top of the Cantilever Rack Builder. If any line is a guess, stop and measure. Guessing at weight or length is how a rack ends up with the wrong spacing.

    How far apart should cantilever uprights be?

    Upright spacing is the center-to-center distance between columns, and it has one job: support the load along its length without sag. A common starting point is half the load length. Our cantilever rack installation checklist uses that rule for the initial spacing, then sets the final spacing by how many arms the load needs.

    How do you test a load for sag?

    Set a sample load on two supports at your starting spacing and look along it. If it bows between them, add a third support and test again. If it still bows, add a fourth. Stiff steel bundles may sit flat on two arms, while thin-wall tubing, PVC or plywood may need three, four or more. RMI notes that more flexible loads may need more arms, or they put unwanted side pressure on the arms.

    How much should the load overhang the end arms?

    About half the column spacing at each end. RMI’s example is a 180-inch (15 ft) load that weighs 3,000 lb, set on three arms 60 inches (5 ft) apart, with each arm carrying 1,000 lb. The operator places it with 30 inches (2.5 ft) of overhang beyond each outer arm, which keeps it balanced side to side. Push the load toward one end and the outer arm on that side takes more than its share.

    Cantilever rack design diagram: 180-inch load on 3 arms 60 inches apart with 30-inch overhang at each end
     A 15 ft load on three arms 5 ft apart overhangs 2.5 ft at each end (RMI example).

    How does a calculated spacing become a real bay?

    The bracing between two uprights fixes their spacing, so your number has to land on a size you can buy. Cantilever bracing from Speedrack West comes in 48, 60 and 72 inch spacing. If your test says 66 inches, round down to 60, not up. Closer spacing adds support. Wider spacing removes it.

    How long should cantilever arms be?

    At least as long as the load is deep. RMI explains that the arm must support the entire depth of the load: the load can’t extend past the arm tip, its center shouldn’t sit beyond the middle of the arm, and it should sit as close to the column as possible. The further out the load rests, the higher the bending force on the arm. RMI quotes the standard directly: arms are designed for loads that are symmetrically placed and evenly distributed in both directions.

    Longer arms also carry less. In the cantilever rack capacity chart for the Speedrack West line, a 48 in x 4 in arm is rated 2,600 lb and a 60 in x 4 in arm 2,000 lb. Pick the shortest arm that supports the full load depth, then check its rating.

    Should you use straight or inclined arms?

    Straight arms suit flat-bottomed loads like lumber, sheet and boxed goods. Inclined arms tilt toward the column so round loads like pipe and bar can’t roll off. On the Rack Builder, straight arms up to 48 inches have a minimum pitch of 3/8 inch per foot to offset deflection, and inclined arms have a 20 degree pitch. For round stock on straight arms, add cantilever stop pins at the tips.

    When can one arm hold several loads?

    When the design calls for it. RMI’s example is three 12-inch-deep loads on a 36-inch arm. Load them back to front: the first against the column, the second in the middle, the third at the front, so the weight stays as close to the column as it can.

    How tall should a cantilever rack be?

    Stack every level from the floor up. Upright height is the base height, plus the height of each load, plus handling clearance at each arm level so the forks can get in and out, plus the thickness of each arm. Then add an extension at the top: the column should rise above the top arm by at least the base height. That rule and the inputs come from our installation checklist.

    Cantilever rack design: end view showing how base, loads, clearances and arm thickness add up to upright height

    The result is a minimum. Your ceiling, sprinkler heads and the lift height of your truck set the maximum. If the stack comes out taller than the building or the truck allows, drop a level or use a shorter load height, and recheck the levels against the capacity chart.

    Which upright heights can you order?

    Cantilever uprights from Speedrack West are stocked in 144 inch (12 ft) and 192 inch (16 ft) heights, with a 48 or 60 inch base, single-sided or double-sided. Taller uprights are available but not stocked, so plan more lead time if your design needs them.

    If your load doesn’t fit a stocked size, arms come in custom sizes on request, and our custom fabrication shop builds parts in house for loads standard racks don’t fit.

    How do bases, bracing and anchors hold the design together?

    The base carries the upright and sets the rack’s footprint. Its depth should be at least the length of the arms, measured from the outside edge of the column to the end of the base. Bracing ties the columns together in the down-aisle direction. RMI says all cantilever rack columns have some type of bracing, taller columns need more of it, and seismic areas may need more still. It keeps the columns from buckling under arm loads and stops the row from swaying.

    Anchors connect it all to a level concrete slab. Anchor type, count and depth come from the rack design and the slab, which is why seismic calculations are part of most permitted projects. Our rack installation team plans anchoring points against the CAD drawings and the seismic design category for the region before the first upright goes up.

    From one of our projects, for GTS Interior Supply in Beaverton, Oregon, the racks were first planned on blacktop next to the warehouse. The loaded racks were too heavy for that surface, so concrete foundations were poured before the single-sided structural cantilever, 16 feet tall with two arm levels, went in.

    How do you lay out cantilever rack aisles?

    Should you use single-sided or double-sided rack?

    Single-sided rack loads from one face, so it runs along a wall or fence line. Double-sided rack has arms on both sides of the same upright line, stands in open floor and needs an aisle on each side. The cantilever rack types guide covers the trade-offs in more detail.

    How wide should a cantilever rack aisle be?

    Aisle width follows the truck and the load. A counterbalance forklift carrying a 20 ft bundle across its forks has to turn that full length into the rack, so it needs far more room than a side loader that drives parallel to the rack and sets the load in sideways.

    Take your truck’s turning and right-angle stacking dimensions from its maker’s spec sheet with your longest load on the forks, then check the result against the code minimums below.

    SourceWhat it requiresApplies when
    OSHA 29 CFR 1910.176(a)Sufficient safe clearance for aisles and turns; aisles kept clear and in good repair; permanent aisles markedMechanical handling equipment is used
    International Fire Code 2024, Sec. 3206.10 (as adopted by GSA without amendment)Aisles at least 44 inches wide in sprinklered buildings, 96 inches in nonsprinklered buildingsHigh-piled combustible storage, where your jurisdiction has adopted this edition

    Fire code minimums are a floor, not a target. A forklift aisle for long loads is usually far wider.

    Why do long loads hit arm tips in the aisle?

    A cantilever rack has no front columns, so the arm tips sit exposed at the aisle face. RMI warns that a load carried down the aisle can strike those tips if the operator doesn’t watch the horizontal clearance, and that long loads sag during placement and removal.

    Designers may add extra horizontal clearance in each storage position to allow for that sag. Leave room for it in your layout, especially for flexible material.

    A CAD warehouse layout drawing lets you check that clearance before anything is installed: our layout designers draw the rack around aisle width and forklift turning radius, along with building columns, sprinkler locations and doors.

    Does a cantilever rack design need engineering or a permit?

    Often, yes. The International Fire Code’s high-piled storage chapter covers combustible storage where the top of storage is more than 12 feet high, or 6 feet for high-hazard commodities.

    Lumber and many building materials are combustible, so a 16 ft cantilever run of lumber can fall under it. Building departments also set their own rules on when storage racks need a permit and stamped structural calculations. Our warehouse racking permit guide explains how those rules differ and what the city asks for, and what is high-piled storage covers the fire side.

    RMI recommends a professional rack engineer with racking experience evaluate the installation site, soils, anchoring, loads and handling equipment. Outdoor racks also have to be designed for snow and wind.

    For one of our projects, at ABC Supply in West Sacramento, 18 single-sided cantilever uprights, 16 feet high, with 144 arms were engineered together with the selective pallet rack under one stamped structural package to Seismic Design Category D.

    Our other project, at Parr Lumber in Damascus, double-sided cantilever for long lumber was part of a high-piled storage project engineered to Seismic Design Category D under the 2021 IBC and ASCE 7-16. It passed final building inspection with the inspector’s note: “Racking appears per plan.”

    What changed in cantilever rack design with ANSI MH16.3-2025?

    ANSI MH16.3 is the design standard for cantilever racks. RMI released the 2025 edition in January 2026, the first revision since the 2016 original. The changes that matter most for design:

    Topic2016 edition2025 edition
    Off-center loadingNo dedicated sectionNew product load section with figures and arm-force equations for centered vs off-center loads
    Arm deflectionArms only had to stay at or above horizontal under loadAn explicit deflection limit, similar to pallet rack beams
    InspectionsExpectedThe engineer of record verifies the design intent and names the elements that need inspection
    Load combinationsOlder methodUpdated for how pallet, seismic and snow loads combine
    Stability and seismicEffective length methodDirect analysis method, the same approach used for selective rack, plus clearer rules for the unbraced zone between the slab and the first brace panel

    The standard is sold by MHI, so the summary above follows RMI’s release notes. Ask your rack supplier or engineer which edition their design follows. Once the rack is in, a rack safety inspection checks it against that list: a review before a new system goes into use, then walkthroughs and a full audit each year.

    Which design mistakes cause cantilever rack failures?

    • Off-center loads. A load pushed toward one end overloads the outer arm on that side, even when the total weight is within the rating.
    • Loads past the arm tip. The arm has to carry the full depth, with the load’s center no further out than the middle of the arm.
    • Too few arms for a flexible load. Sagging material presses sideways on the arms. Test for sag and add supports.
    • New loads in old bays. RMI says to check the LARC drawings before storing a load the rack wasn’t designed for, and to label which bays hold which loads.
    • Hard vertical impacts. Dropping or lifting a load sharply can knock an arm loose. RMI notes MH16.3 designs arms and connections for an extra 25 percent of the load, up and down, which is a margin, not permission.
    • Missing bracing or anchors. Every column needs bracing, and the rack has to be anchored as designed.
    • Treating duty labels as ratings. Light, medium and heavy duty are product descriptions. The capacity chart or load plaque is the rating.

    How do you turn the design into an order?

    Design decisionWhat you order
    Upright spacingBracing at 48, 60 or 72 inches
    Arm length and sizeStructural cantilever arms, 48 or 60 inches
    Upright height and accessUprights, 12 or 16 ft, single or double-sided
    Round or loose loadsStop pins and other cantilever rack accessories
    Yard storageOutdoor cantilever racks with roof supports

    For standard bays, the Cantilever Rack Builder turns your choices into a bill of materials and a live price. For multiple rows, building columns, sprinklers or a yard, a CAD warehouse layout puts the whole design on paper before anything ships.

    Can you finance a cantilever rack project?

    Yes. Speedrack West works with a partner lender that offers equipment financing, term loans, lines of credit and working capital funding. The lender typically completes underwriting in 24 to 72 hours after it receives the application and documents, and there’s no upfront fee to apply. See financing for racking projects for details.

    Frequently asked questions

    What are the main parts of a cantilever rack?

    A cantilever rack has four main parts: uprights (the vertical columns), bases that sit on the floor and are anchored to it, arms that project from the uprights and carry the load, and bracing that ties the uprights together. Accessories such as stop pins and end caps are added for specific loads.

    How many arms does a cantilever rack need?

    Enough that the load stays flat. Start with two supports and test the load. If it sags between them, add another support and test again. Very long or flexible loads, such as pipe, tubing or thin sheet, usually need more arms and closer upright spacing than stiff bundles.

    How long should the base of a cantilever rack be?

    The base depth should be at least the length of the arms, measured from the outside edge of the column to the end of the base. That keeps the rack’s footprint as deep as the loads it holds.

    Can you mix single-sided and double-sided cantilever runs in one layout?

    Yes. Many yards run single-sided rack along a wall or fence line and double-sided rows in open areas where trucks can reach both faces. Plan the aisles for the truck that serves each run, and keep each load type in the bays designed for it.

    Do I need an engineer to design a cantilever rack?

    For anything beyond a small standard bay, yes. The Rack Manufacturers Institute recommends a professional rack engineer review the site, soils, anchoring, loads and handling equipment, and many building departments require stamped calculations before they issue a rack permit.

    Design it in order, then build it

    Good cantilever rack design follows the load. Measure it, set upright spacing so it stays flat, choose arms that carry its full depth, and stack the levels to get the upright height. Then lay out the aisles for the truck you actually run and check whether the height brings in the fire code or a permit.

    If your bays are standard, configure them in the Cantilever Rack Builder and see the price. If the job is a full yard or a permitted building, send us your loads and floor plan for a CAD warehouse layout, and you can pay for the project over time through financing.

    Was this helpful?