We are proud of serving
Phoenix, AZ and the surrounding area

Pallet Racking in Phoenix, AZ

Speedrack West supplies pallet racks to Phoenix warehouses across the Valley, from the West Valley distribution corridor along I-10 and Loop 303 to the industrial parks in Deer Valley and north Phoenix. Pallet racking in Phoenix, AZ covers selective, drive-in, pushback, pallet flow, and structural cantilever systems, plus used racking when the budget calls for it. Every layout is drawn to Arizona's adopted building code and anchored to engineered calculations. Design, permit drawings, delivery, and installation come from one team.

or

Call us now:

503-640-5666
Brand Logo
Brand Logo
Brand Logo
Brand Logo
Brand Logo
Brand Logo
Brand Logo
Brand Logo
Brand Logo

Racking Delivery and Services in Phoenix, AZ

Most standard racking orders to Phoenix can arrive in as little as

5–7 DAYS


Actual delivery times vary. Large projects, structural systems, and permit-tied orders may take longer. We ship from multiple U.S. locations – once we see your scope, we’ll give you a real lead time.

Services We Provide in Phoenix

Safety Inspection

Enforcement Agency

Arizona ADOSH

Rack Standard

ANSI MH16.1

Phoenix distribution buildings run forklifts hard, and damage shows up first at the base plate and the bottom 18 inches of the upright. Our inspectors walk every bay, tag findings green, yellow, or red, and hand you a written record of each one. You get a repair list ranked by severity and the replacement components to close it out, not a blanket quote to replace the system. Multi-building operators in the Valley can have sites inspected on one trip.

Installation

Building Code

2024 PBCC

Load Plaque

50 Square Inches Minimum

Our crew installs to the approved drawings, anchors every base plate to the layout, and sets flue spacing before the first pallet lands. We check slab condition and anchor embedment on site instead of assuming what the floor will hold. Load plaques go up at the end of the install, positioned where the operators actually see them. Large Phoenix installs start early in the day through the summer so the crew works through the heat, not against it.

Permits

Local Authority

Phoenix Planning and Development

Permit Threshold

Racks Over 5'-9"

We prepare the floor plan, elevation drawings, design loading, and the anchor and base plate calculations a Phoenix racking submittal has to include. Sites inside city limits go to one authority and sites in unincorporated areas go to another, so we confirm the jurisdiction before drawing anything. When your storage area is large enough to pull in the fire review, we build that package alongside the structural one. We answer the plan checker’s comments so your team is not chasing corrections.

Pallet Racking Built for the Valley

Pallet Racking Built for the Valley

Pallet Racking Built for the Valley

Warehouse racking in Phoenix has to work in buildings spread from the West Valley I-10 corridor to Deer Valley and the freight ring around Sky Harbor. We ship from multiple U.S. locations and send our own crews into the Valley instead of handing the install to a subcontractor.

The Phoenix industrial base runs on distribution, advanced manufacturing, and the supplier network that grew up around the semiconductor campuses in north Phoenix. We size and anchor racking for both single-tenant fulfillment buildings and multi-tenant flex space in those submarkets.

New and used pallet racks for sale in Phoenix, plus pallet flow, drive-in, pushback, cantilever, and structural systems. Pallet rack installation in Phoenix is handled by our own crew, working from the same drawings our engineering team submitted.

Requirements and Regulations Specific to Racking in Phoenix, AZ

Requirements and Regulations Specific to Racking in Phoenix, AZ

Are racking permits required in Phoenix, AZ?

Yes, once the rack stands taller than 5 feet 9 inches. Most warehouse projects here run two reviews in parallel: a structural racking submittal and, above a certain storage area, a high-piled combustible storage review under the Phoenix Fire Code. Budget engineering time at the front of the project, because the drawings and calculations have to exist before any review clock starts.

Who You'll Work With

Inside city limits, the City of Phoenix Planning and Development Department reviews the racking submittal and the Phoenix Fire Department handles high-piled storage. Sites outside the city boundary fall to the Maricopa County Planning and Development Department instead. Confirm which one covers your parcel before anyone starts drawing.

Why This Matters for Phoenix Operations

Rack height decides the submittal path, and the step from a reduced review to a full structural package lands at 12 feet. Settle height and load targets early: moving a system from 12 feet to 16 feet after approval means new drawings, new calculations, and a new review. The same applies to beam elevations once a fire submittal is in, since the sprinkler design was reviewed against the layout you filed.

Key Requirements

  • Permit Requirement:

    Racking at or below 5 feet 9 inches is exempt under International Building Code Section 105.2. Above that height a permit is required. Racks over 5 feet 9 inches and up to 12 feet qualify for a reduced submittal when the height-to-depth ratio is under 8, no level supports more than 2,500 lbs, and the building is Risk Category I or II. Every other height, weight, and depth combination requires the full structural package.

  • Application:

    Submittals for sites inside city limits go to the City of Phoenix Planning and Development Department. Sites in unincorporated areas go to the Maricopa County Planning and Development Department. The reduced category can be handled as a permit by inspection with a potential structural over-the-counter review; the full category requires both a building department permit and a fire permit.

  • Seismic Design Category:

    Phoenix adopted the 2024 Phoenix Building Construction Code effective August 1, 2025. It is based on the 2024 International Building Code, which references ASCE 7-22. Seismic Design Category is not a fixed letter for the city. It is determined per ASCE 7-22 from the building’s risk category, the mapped spectral response values at your address, and the site class established by geotechnical data, and a registered engineer assigns it for your specific site.

  • Engineering:

    ASCE 7-22 revised the seismic hazard maps and expanded the site class system, so parameters pulled under an older code cycle do not carry over to a new submittal. Anchor and base plate calculations are part of every permitted racking package. For racks with a height-to-depth ratio over 6, those calculations must also cover a 350 lb live load applied at the top shelf of an entirely empty frame, directed perpendicular to the aisle, per ANSI MH16.1 Section 8.1 and MH16.3 Section 9.1.

  • High-Piled Combustible Storage:

    The Phoenix Fire Code is an amended version of the 2024 International Fire Code, and Chapter 32 governs high-piled combustible storage. A construction permit is required for installation of or modification to a high-piled storage area exceeding 500 square feet, and that 500 square feet includes the aisles, not just the rack footprint. A separate operational permit is required to use a building or portion of one with more than 500 square feet of high-piled storage. Group S, F, and M speculative buildings with an interior clear height greater than 12 feet also fall under the chapter.

  • Sprinkler Coordination:

    The high-piled storage submittal has to show sprinkler design criteria for every high-piled area, aisle dimensions between each storage array, commodity classification, the location of valves controlling ceiling and in-rack sprinklers, and the location and hardware of required fire department access doors. Rack layout and sprinkler design are reviewed together, so a change to beam elevations after approval reopens the fire review.

  • Load Capacity:

    Anything outside the reduced submittal category requires complete structural loading, drawings, and calculations for the racks, anchors, and slab in accordance with ANSI MH16.1 or MH16.3. The reduced category caps out at 2,500 lbs total supported by any one level, a height-to-depth ratio under 8, and a 12 foot rack height. Design structural loading must be stated on the drawings at every permit level above the exemption.

  • Anchoring:

    Details and calculations for anchors and base plates are required on every permitted racking submittal, along with a structural special inspection certificate for the anchors. The slab is part of the review, not an assumption: the Planning and Development Department publishes a separate technical document covering acceptable design of slabs-on-ground supporting storage racking. Manufacturer maximum load plaque locations have to be shown on the submittal as well.

  • General Duty Clause:

    Arizona runs an OSHA-approved state plan through the Arizona Division of Occupational Safety and Health, a division of the Industrial Commission of Arizona with its main office in Phoenix. It covers most private sector workplaces in the state and has adopted the federal standards by reference. No federal standard addresses storage racks directly, so rack collapse, overloading, and damaged uprights are cited under the general duty clause.

  • Ongoing Compliance:

    Manufacturer maximum load plaques are required per ANSI MH16.1 Section 1.4.2, must be posted in conspicuous locations, and must be at least 50 square inches. Keep damage inspections documented and dated. Arizona inspections can follow a work-related accident, a complaint, a referral from another agency, or a planned visit, so the written record is what you hand over when someone shows up.

  • Pre-Install Engineering Review:

    Before any steel ships, our team audits your order against your site dimensions, forklift class, and pallet specs. We catch specification errors before they leave our facility – and we document everything so your receiving team knows exactly what to expect at the dock.

  • Post-Install Verification:

    After install, we verify anchor placement and base plate seating against the approved drawings and coordinate the structural special inspection of the anchors that the Phoenix permit requires. Load plaques go up before the racks are loaded, in the locations shown on the submittal.

  • Zoning Compliance:

    Warehouse and industrial racking projects in Phoenix generally sit in the A-1 Light Industrial District, Section 627 of the Phoenix Zoning Ordinance, or the A-2 Industrial District, Section 628. In A-1, building height is capped at 56 feet, with up to 80 feet allowed by use permit with a specific plan of development, and a warehouse may request up to 110 feet.

  • Site-Specific Checks:

    Zoning governs the building envelope rather than your rack height, but the two meet when you stack toward the roof. Confirm the parcel’s district and any overlay before you fix top beam elevation, since parcels inside approved transit oriented development boundaries can fall under the Walkable Urban Code instead of the underlying industrial district.

Custom Racking for Phoenix Industries

Phoenix industrial demand runs through distribution, advanced manufacturing, and the trades building for both. Here is how we serve each one.

Logistics & Other Distribution

The West Valley corridor along I-10 and Loop 303 carries most of the metro’s large-format distribution and e-commerce fulfillment volume, and Phoenix leasing in that segment stayed strong through 2025. We build selective and pushback systems for the mixed-SKU throughput those buildings run, and size beams to the actual pallet rather than a catalog default.

Electrical, Power & Low-Voltage

North Phoenix has turned into a semiconductor and electronics manufacturing corridor, with the component and supplier network that follows fab construction. Behind the production floor those facilities need staging racks, reel and cable storage, and small-part racking for component inventory, which is a different build than a pallet-only warehouse.

Construction & Field Contractors

Arizona’s construction workforce grew to 226,800 jobs by December, pushed by semiconductor, data center, and freeway work including the I-10 widening south of Phoenix. Contractor yards across the Valley store conduit, pipe, and long stock that never sits on a pallet, which calls for cantilever and stacking racks instead of standard beam levels.

We are Phoenix’s largest pallet rack and material handling distributor!

What Pallet Rack type is right for you?

In Phoenix, Arizona, the right racking system depends on your industry, throughput, and facility layout. West Valley distribution buildings along I-10 and Loop 303, semiconductor suppliers in north Phoenix, and contractor yards across the Valley each run different industrial racking systems in Phoenix. If you’re not sure which fits, that’s the conversation we want to have first.

Selective Pallet Racks

Selective Pallet Racks

The most common type of pallet racking system. It provides direct access to each pallet, making it suitable for warehouses with a wide variety of products.

Advantages

Flexibility, ease of access, and compatibility with most types of forklifts.

Compliance

Must meet structural and seismic requirements as outlined in the local building codes and ASCE 7 standards.

Advantages

Flexibility, ease of access, and compatibility with most types of forklifts.

Compliance

Must meet structural and seismic requirements as outlined in the local building codes and ASCE 7 standards.


Drive-In/Drive-Through Racks

Drive-In/Drive-Through Racks

Designed for high-density storage, allowing forklifts to drive directly into the rack to place or retrieve pallets. Drive-In racks have one entry and exit point, while Drive-Through racks have entry and exit points on both sides.

Advantages

Maximizes storage space by reducing aisle space.

Compliance

Requires careful design and anchorage to meet safety standards, especially in seismic zones​.

Advantages

Maximizes storage space by reducing aisle space.

Compliance

Requires careful design and anchorage to meet safety standards, especially in seismic zones​.


Push-Back Racks

Push-Back Racks

A high-density storage system where pallets are loaded from the front and pushed back on inclined rails. When a pallet is removed, the next pallet automatically moves forward.

Advantages

Increases storage density while providing better access to products compared to drive-in racks.

Compliance

Needs to adhere to local structural requirements and periodic inspections for safety​.

Advantages

Increases storage density while providing better access to products compared to drive-in racks.

Compliance

Needs to adhere to local structural requirements and periodic inspections for safety​.


Pallet Flow Racks

Pallet Flow Racks

Utilizes gravity flow lanes to move pallets from the loading side to the picking side. Ideal for first-in, first-out (FIFO) inventory management.

Advantages

Efficient for warehouses with high turnover rates and expiration-sensitive products.

Compliance

Requires detailed structural analysis and compliance with seismic bracing standards.

Advantages

Efficient for warehouses with high turnover rates and expiration-sensitive products.

Compliance

Requires detailed structural analysis and compliance with seismic bracing standards.

Designing Your Pallet Rack

Try our Pallet Rack Builder to design your system and get instant final pricing upon checkout.

Try Pallet Rack Builder
FAQ

Do you serve warehouses outside Phoenix in the rest of the Valley?

Yes. We cover the Phoenix metro including Glendale, Goodyear, Tolleson, Mesa, Chandler, and Scottsdale, along with sites in unincorporated Maricopa County.

Is used pallet racking available for a Phoenix warehouse?

Yes, used pallet racks are an option in Phoenix alongside new systems. What is available depends on inventory at the time you order.

How does Arizona’s state OSHA program affect rack safety in a Phoenix warehouse?

Workplace safety here is enforced by the Arizona Division of Occupational Safety and Health rather than federal OSHA directly. It has adopted the federal standards by reference, so overloaded or damaged racking is cited under the general duty clause.

Key Notions

Pallet racks are known throughout the industry by many names. Below are some of the more common terms that are used interchangeably for pallet racking.

  • Industrial shelving
  • Industrial pallet racks
  • Stacking Rack
  • Warehouse shelving
  • Industrial racking systems
  • Load-bearing Rack
  • Warehouse racking systems
  • Pallet rack systems
  • Bulk Storage Rack
  • Warehouse racks
  • Pallet racking storage
  • Heavy-Duty Rack
  • Pallet racking
  • Pallet racking uprights and beams
  • Pallet Shelving
  • Warehouse racking
  • Industrial Rack
  • Logistics Rack
  • Warehouse pallet shelving rack
  • Racking System
  • Palletized Storage System
  • Storage racking
  • Shelving Unit
  • Freight Storage Rack
  • Warehouse storage racks
  • Material Handling Rack
Case Studies & Reviews See all case studies
  • rated

    5.0 ...............

  • reviews

    160+

Write a review

Irving Nieves says: “It's been an easy process working with the Speedrack West team, even with the changes partway through.”

Open full case study

Kyle Gersman says: “I called Bill multiple times a day and he always picked up and was always very helpful. What I really liked is that they pointed out a lot of questions and processes that I didn't even have on my radar going into the move. It helped me expand the scope to an appropriate size of what I needed to consider as we made the transition to a bigger facility.”

Open full case study

Robert Baumgartner says: “Despite picking up this project in the middle of its lifecycle, the transition was flawless thanks to the team’s stellar communication. They exceeded our expectations by delivering the installation earlier than anticipated and hitting every technical requirement. From the sales team’s quick answers to their willingness to make adjustments, the experience was top-tier.”

Open full case study

Consolidated Supply says: “We’re very happy to be your regular client, and it’s always so easy to work with your team”

Open full case study

Lumber Company says: “Working with Speedrack West team has been a real pleasure. They made the whole process smooth and straightforward, and we’re 100% planning to come back again—which we actually just did recently.”

Open full case study

Derek Patterson says: “I would suggest that there should be no hesitation…from placing an order to getting everything delivered in such a timely manner. I had racking within 7 days compared to 4 to 6 weeks elsewhere. The customer service level is fabulous.”

Open full case study

Need Warehouse Help in Phoenix? Let’s Talk.

Subscribe

to our newsletter

STAY UPDATED

on deals & new products