Medford, OR and the surrounding area
Pallet Racking Systems in Medford, OR
Pallet rack for Medford warehouses, from single-bay additions to full facility builds across the Rogue Valley. We design the layout, pull the building permit, and install the system with our own crews. Pallet racking in Medford, Oregon is permit work once the rack clears 8 feet, and we run that submittal for you. Selective, pushback, pallet flow, cantilever, and structural systems, all built to Oregon's seismic code.
Racking Delivery to Medford, OR
Most standard racking orders to Medford can arrive in as little as
3–5 DAYS
Actual delivery times vary. Large projects, structural systems, and permit-tied orders may take longer. We ship from multiple U.S. locations – once we see your scope, we’ll give you a real lead time.
Services We Provide in Medford
Inspection Standard
ANSI MH16.1
Tagging Method
Green / Yellow / Red
We walk your Medford facility rack by rack and tag every frame green, yellow, or red. Columns, anchor plates, struts, beams, and frames each get checked, and the results go to you documented, not verbal. Inspections run while your forklifts keep working, so the warehouse does not shut down for the day. If a frame fails, we quote the replacement component off the same visit.
Coverage
Jackson County, OR
Anchoring
To Stamped Drawing
Our crews install in Medford and across Jackson County rather than subcontracting the work to whoever is available locally. Every upright gets anchored to the engineered drawing, not to field judgment. We install into occupied warehouses in phases when the operation cannot stop, unloading and reloading section by section. Capacity labels go up before we leave the site.
Local Authority
City of Medford Building Safety
Height Trigger
Racks Over 8 Feet
Racking over 8 feet in Medford needs a building permit, and applications are submitted online. We prepare the drawing set and the engineering package that goes with it. If your storage height triggers high-piled review, we coordinate that submittal alongside the building permit instead of running them in sequence. You get one point of contact for the whole approval, not a drawing handoff.
Shop Our Products
Discover
300+
products
Requirements and Regulations Specific to Racking in Medford, OR
Yes. Installing or modifying a pallet racking system in a Medford warehouse requires a building permit, and racks over 8 feet are the common trigger. Plan the approval into your schedule before the steel is ordered, not after it arrives.
Who You'll Work With
Why This Matters for Medford Operations
Key Requirements
-
Permit Requirement:
A building permit is required to install or modify pallet racking in a Medford warehouse. In the City of Medford, and across most of the Pacific Northwest, any rack over 8 feet tall typically requires one, and shorter racks can require one in higher-risk occupancies.
Application: Building applications are submitted online to City of Medford Building Safety, which provides permitting, plan review, and inspection services. -
Engineering:
Rack uprights are unbraced vertical structures, so lateral load governs the base connection more often than the stored weight does. Anchorage counts, embedment depth, and slab thickness all come out of the seismic calculation, and the plan review expects them shown on the drawing rather than decided in the field.
-
Seismic Design Category:
Typically classified as Seismic Design Category D (SDC D) in the Medford area due to regional seismic risks, the seismic design category for a specific Medford site is assigned under ASCE 7 based on site class and risk category, and must be confirmed for your address before the drawing is stamped.
-
Engineering:
Rack uprights are unbraced vertical structures, so lateral load governs the base connection more often than the stored weight does. Anchorage counts, embedment depth, and slab thickness all come out of the seismic calculation, and the plan review expects them shown on the drawing rather than decided in the field.
-
High-Piled Combustible Storage:
Oregon Fire Code Chapter 32 governs high-piled combustible storage. Where the building official requires it, the classification also covers certain high-hazard commodities including rubber tires and Group A plastics, which changes the requirements regardless of how the rest of the building is used.
-
Sprinkler Coordination:
Under Chapter 32, required fire safety features extend to the lesser of 15 feet beyond the high-piled storage area or a full-height wall. That boundary decides where your rack rows can end, so flue spaces, aisle widths, and rack layout have to be settled against the existing sprinkler design before the layout is final.
-
Load Capacity:
Capacity is set by the beam and upright pairing, the number of levels, and the vertical spacing between them, not by the beam alone. Lowering one beam level on an installed frame changes the rated capacity of the whole bay, which is why reconfigurations need the load chart rechecked before pallets go back on.
-
Anchoring:
Every upright is anchored to the slab. Anchor type and count come from the engineered drawing, and existing slab thickness, control joints, and prior patching all affect what the connection can develop, which is worth confirming before install day.
-
General Duty Clause:
OSHA’s General Duty Clause requires employers to provide a workplace free of recognized hazards. There is no rack-specific OSHA standard, so a damaged upright, an unlabeled bay, or an overloaded beam is cited under the General Duty Clause instead.
-
Ongoing Compliance:
Rack damage accumulates from forklift contact and does not repair itself. Documented periodic inspections, posted load capacity labels, and a written process for pulling damaged frames out of service are what an inspector looks for in a Medford facility.
-
Pre-Install Engineering Review:
Before any steel ships, our team audits your order against your site dimensions, forklift class, and pallet specs. We catch specification errors before they leave our facility – and we document everything so your receiving team knows exactly what to expect at the dock.
-
Post-Install Verification:
After install, we verify anchor placement and beam level heights against the permitted drawing and post capacity labels on each bay. That verification is what your Medford building inspection is checked against, so it happens before we leave the site.
-
Zoning Compliance:
Regulated by the Medford Planning Department, warehousing is generally permitted outright in Light Industrial (I-L) and General Industrial (I-G) zones. Confirm the zoning designation and permitted use for warehouse storage at the specific Medford parcel before layout, particularly if the building’s prior use was not warehousing (which may trigger a formal Change of Use review).
-
Site-Specific Checks:
Racking installed outdoors or in a yard raises questions interior rack does not, including setbacks, foundation work, and site coverage. Sites in unincorporated Jackson County fall outside City of Medford review, so confirm which jurisdiction applies before drawings are prepared.
Racking Built for Rogue Valley Industries
Medford’s warehouse base is smaller than Portland’s and more mixed. One building often runs three storage profiles at once, and the layout has to account for that from the start.
Automotive & Auto Parts
- Automotive is among the largest private employment sectors in the Medford area, and parts operations store thousands of low-turn SKUs alongside bulky items like bumpers and body panels. We pair selective pallet rack with small-part shelving in the same aisle run so pickers are not walking between two zones, and we add cantilever or specialty rack where the item is too long or too awkward for a pallet position.
Logistics & Other Distribution
- Medford’s position on I-5 makes it a distribution point for Southern Oregon and Northern California, and local logistics hiring reflects steady volume. Mixed-SKU distributors here usually need selective rack for pick faces plus pushback or pallet flow for the fast-moving lines, and we design the aisle layout around the forklift class already in the building rather than the other way around.
Retail, Ecommerce & Consumer Goods
- Retailers serving the Rogue Valley and the Oregon Coast run distribution out of Medford and hold large, irregular inventory. We build racking for oversized items that do not sit on a standard pallet, sizing bay openings to the product instead of forcing the product into a stock bay.
We are Medford’s largest pallet rack and material handling distributor!
What Pallet Rack type is right for you?
In Medford, Oregon, the right racking system depends on your industry, throughput, and facility layout. Automotive parts operations, I-5 distributors, and Rogue Valley retailers each move product at a different pace, and pallet racks that suit one of them will slow another down. If you’re not sure which fits, that’s the conversation we want to have first.
Selective Pallet Racks
The most common type of pallet racking system. It provides direct access to each pallet, making it suitable for warehouses with a wide variety of products.
Advantages
Flexibility, ease of access, and compatibility with most types of forklifts.
Compliance
Must meet structural and seismic requirements as outlined in the local building codes and ASCE 7 standards.
Advantages
Flexibility, ease of access, and compatibility with most types of forklifts.
Compliance
Must meet structural and seismic requirements as outlined in the local building codes and ASCE 7 standards.
Drive-In/Drive-Through Racks
Designed for high-density storage, allowing forklifts to drive directly into the rack to place or retrieve pallets. Drive-In racks have one entry and exit point, while Drive-Through racks have entry and exit points on both sides.
Advantages
Maximizes storage space by reducing aisle space.
Compliance
Requires careful design and anchorage to meet safety standards, especially in seismic zones.
Advantages
Maximizes storage space by reducing aisle space.
Compliance
Requires careful design and anchorage to meet safety standards, especially in seismic zones.
Push-Back Racks
A high-density storage system where pallets are loaded from the front and pushed back on inclined rails. When a pallet is removed, the next pallet automatically moves forward.
Advantages
Increases storage density while providing better access to products compared to drive-in racks.
Compliance
Needs to adhere to local structural requirements and periodic inspections for safety.
Advantages
Increases storage density while providing better access to products compared to drive-in racks.
Compliance
Needs to adhere to local structural requirements and periodic inspections for safety.
Pallet Flow Racks
Utilizes gravity flow lanes to move pallets from the loading side to the picking side. Ideal for first-in, first-out (FIFO) inventory management.
Advantages
Efficient for warehouses with high turnover rates and expiration-sensitive products.
Compliance
Requires detailed structural analysis and compliance with seismic bracing standards.
Advantages
Efficient for warehouses with high turnover rates and expiration-sensitive products.
Compliance
Requires detailed structural analysis and compliance with seismic bracing standards.
Industrial Pallet Rack Safety Considerations
Safety is a top priority here at Speedrack West. Train your employees on safe loading practices and maintaining clear aisles for forklift operations to prevent accidents and injuries. However there are few safety measures available.
If pallet rack safety is compromised, racks can collapse under excessive loads, leading to severe injuries, fatalities, and significant inventory loss. Items may fall from the racks, posing a danger to workers and potentially damaging goods. Impact damage from forklifts can weaken the structure, increasing the risk of failure.
Designing Your Pallet Rack
Try our Pallet Rack Builder to design your system and get instant final pricing upon checkout.
Try Pallet Rack BuilderDo you serve warehouses in Jackson County outside Medford city limits?
Yes. We cover Central Point, White City, Ashland, Talent, Phoenix, and out to Grants Pass and Klamath Falls.
How does Oregon’s seismic code affect pallet rack installation in Medford?
Every rack installed here needs engineered anchorage calculated under ASCE 7, and those calculations are part of the permit package. The seismic design category depends on your specific site class, so it is confirmed per address before the drawing is stamped.
Can you supply warehouse shelving in Medford as well as pallet rack?
Yes. Boltless shelving for small parts and pallet rack for palletized loads come from the same order, which is common in Rogue Valley buildings running both storage types in one aisle.
Key Notions
Pallet racks are known throughout the industry by many names. Below are some of the more common terms that are used interchangeably for pallet racking.
- Industrial shelving
- Industrial pallet racks
- Stacking Rack
- Warehouse shelving
- Industrial racking systems
- Load-bearing Rack
- Warehouse racking systems
- Pallet rack systems
- Bulk Storage Rack
- Warehouse racks
- Pallet racking storage
- Heavy-Duty Rack
- Pallet racking
- Pallet racking uprights and beams
- Pallet Shelving
- Warehouse racking
- Industrial Rack
- Logistics Rack
- Warehouse pallet shelving rack
- Racking System
- Palletized Storage System
- Storage racking
- Shelving Unit
- Freight Storage Rack
- Warehouse storage racks
- Material Handling Rack
Contact Us Today. We’re Ready to Help!











































