We are proud of serving
Tigard, OR and the surrounding area

Pallet Racking in Tigard, OR

Pallet racking in Tigard, Oregon has to fit tight infill warehouse footprints along the Highway 217 and I-5 junction, not a wide-open greenfield floor plan. We supply and install selective rack, cantilever racks, and pipe storage racks for distributors, contractors, and manufacturers across Washington County. Every layout is drawn to Oregon's adopted building code and anchored to spec. We ship from multiple U.S. locations and install with our own crews.

or

Call us now:

503-640-5666
Brand Logo
Brand Logo
Brand Logo
Brand Logo
Brand Logo
Brand Logo
Brand Logo
Brand Logo
Brand Logo

Racking Delivery and Services in Tigard, OR

Most standard racking orders to Tigard can arrive in as little as

3–5 DAYS


Actual delivery times vary. Large projects, structural systems, and permit-tied orders may take longer. We ship from multiple U.S. locations – once we see your scope, we’ll give you a real lead time.

Services Available in Tigard, OR

Safety Inspection

Inspection Standard

ANSI MH16.1

Tagging Method

Green, Yellow, Red

Our inspectors walk every bay and tag frames green, yellow, or red so you know which uprights carry load and which come out of service. Inspections in Tigard cover columns, anchor plates, struts, beams, and frames, and they run while your forklifts keep working. We document the findings so you have a written record if a fire or building inspector asks. Damaged uprights get quoted for replacement at the same capacity or higher.

Installation

Anchorage Basis

ASCE 7 Engineered

Scope

Tear-Down + Install

Our crews handle pallet rack installation in Tigard from truck to torque, including tear-down of the system you are replacing. Older Tigard warehouse slabs vary in thickness and condition, so we verify the slab before anchors go in and adjust the anchor plan when it does not hold up. Crews anchor every frame to the engineered spec on the stamped drawings, not to a field guess. We clean up and stage the site for inspection before we leave.

Permits

Local Authority

City of Tigard

Our Goal

First-Pass Approval

We prepare and submit the drawings for racking permits on Tigard sites so your team is not chasing a submittal it has never filed before. That includes rack elevations, anchorage details, and load data packaged the way plan reviewers expect to see it. High-piled combustible storage adds a fire review on top of the building permit, and we coordinate both. If your site sits outside city limits, the submittal routes to the county instead and we handle that path too.

Warehouse Racking Built for Washington County

Warehouse Racking Built for Washington County

Warehouse Racking Built for Washington County

Tigard warehouses sit on infill industrial land between Highway 217, I-5, and the Tigard Triangle, which means short bays and tight turning radii. We size warehouse racking Tigard buildings can actually accept instead of dropping in a template layout.

Plumbing and waterworks distribution is a real presence in this market, and that inventory does not palletize cleanly. Cantilever racks and pipe storage racks in Tigard carry the long stock while selective rack handles the palletized side.

We are 15 miles up the road in North Plains, so our crews reach Tigard, Tualatin, and Sherwood sites without travel days. Industrial racking systems Tigard operations order arrive from our stock and go in with our own installers.

Requirements and Regulations Specific to Racking in Tigard, OR

Requirements and Regulations Specific to Racking in Tigard, OR

Are racking permits required in Tigard, OR?

Yes. Storage racks are structures under Oregon’s adopted building code, and a Tigard installation needs a permit before steel goes up. Plan for two review paths on the same project: the building permit through the City of Tigard, and a separate fire review if your storage height puts you into high-piled combustible storage. Build that sequence into your project schedule rather than treating it as paperwork at the end.

Who You'll Work With

City of Tigard permit staff handle building submittals for sites inside city limits, and Washington County reviews sites in unincorporated areas just outside them. Tualatin Valley Fire & Rescue is the fire authority for this area and reviews high-piled storage. Confirm which jurisdiction your address falls under before you file, because Tigard’s boundary is irregular.

Why This Matters for Tigard Operations

A rejected submittal costs weeks, not days, and the racking sits on the dock while you wait. Tigard sites add a second variable: many are older leased buildings where the existing sprinkler layout and slab were designed for a different storage plan than the one you are installing. Getting anchorage and storage height settled before order release keeps the install date real.

Key Requirements

  • Permit Requirement:

    Pallet racking is a structure under Oregon’s adopted building code, so a building permit is required for installations in Tigard. Submittals need rack elevations, load data, and anchorage details showing how the system transfers load into the slab.

  • Application:

    Building submittals for sites inside city limits go to the City of Tigard. Sites in unincorporated areas outside the city boundary are reviewed by Washington County instead.

  • Seismic Design Category:

    The specific seismic design category for a Tigard address is set by the site’s soil class and mapped ground motion values. Because Tigard is located within the Portland metropolitan area’s high seismic hazard zone—influenced by both the Cascadia Subduction Zone and local crustal faults—most industrial and commercial sites will default to a stringent Seismic Design Category D (SDC D) until formal geotechnical testing confirms the exact site class.

  • Engineering:

    Oregon’s adopted building code applies ASCE 7 seismic provisions to storage racks, so engineered anchorage is required on every installation regardless of rack height. The engineer sizes anchor type, embedment, and frame base plates from the actual slab and the loaded rack weight, which is why the slab has to be verified before anchors are specified.

  • High-Piled Combustible Storage:

    Storage above the high-piled threshold triggers a separate fire review on top of the building permit, and Tualatin Valley Fire & Rescue is the fire authority for the Tigard area. The exact height and commodity class thresholds that apply to your building are set by the fire code edition in force. Under the current Oregon Fire Code enforced by TVF&R, this specialized review is required anytime storage exceeds 12 feet in height for standard commodities (Class I-IV) or 6 feet for high-hazard materials (such as Group A plastics), across an area larger than 500 square feet. The TVF&R submittal requires a detailed commodity classification matrix and an evaluation of the existing overhead sprinkler system to prove it can suppress a fire in your specific rack configuration.

  • Sprinkler Coordination:

    Rack layout, flue spaces, and top-of-load height all interact with the sprinkler system already in the building. Many Tigard warehouses are leased older shells where the sprinkler design predates the storage plan being installed, so clearances and decking type have to be checked against that existing system before order release.

  • Load Capacity:

    Load capacity plaques must be visible on the installed system and the posted ratings have to be followed on the floor. Capacity is set per beam level and per frame at a specific configuration, so changing beam elevations after install changes the rating and the plaque has to match what is actually built.

  • Anchoring:

    Racks must be anchored to the floor and maintained in that condition, with materials stacked and secured on them. Anchor size and count come from the engineered drawings, and slab thickness, edge distance, and existing cracking all affect what holds. On older Tigard slabs we verify those conditions in the field before anchors are set.

  • General Duty Clause:

    Oregon OSHA administers workplace safety enforcement in Tigard, and storage racks fall under the employer’s duty to keep the workplace free of recognized hazards. Damaged uprights, missing anchors, and unlabeled capacities are the findings that come up most often on warehouse inspections.

  • Ongoing Compliance:

    Compliance is a condition, not a one-time sign-off, so the system has to stay in the state it was approved in. Set a documented inspection interval, pull damaged frames out of service instead of derating them informally, and keep the repair records with the original drawings.

  • Pre-Install Engineering Review:

    Before any steel ships, our team audits your order against your site dimensions, forklift class, and pallet specs. We catch specification errors before they leave our facility – and we document everything so your receiving team knows exactly what to expect at the dock.

  • Post-Install Verification:

    After install, we verify plumb, beam engagement, safety clips, and anchor torque against the stamped drawings, then check that capacity plaques match the built configuration. The as-built package goes to your file so the City of Tigard or the fire authority sees the same system that was approved.

  • Zoning Compliance:

    Tigard’s base zones fall into five categories: Residential, Commercial, Mixed-Use, Industrial, and Parks and Recreation. Warehouse storage belongs in Industrial and certain Mixed-Use zones, so confirm your address on the Tigard Zoning Map before planning added storage volume.

  • Site-Specific Checks:

    Sites inside the Tigard Triangle Plan District carry their own overlay standards, and Chapter 15.16 of the Tigard Municipal Code requires an encroachment permit for privately owned structures in areas that chapter covers. Outdoor racking near property lines, drive aisles, or right-of-way needs that check before installation.

Custom Racking for Tigard Industries

Tigard’s warehouse base is distribution, trade supply, and public agency operations packed into limited industrial land near Highway 217 and I-5. Here is how we handle storage for the three that show up most.

Logistics & Other Distribution

Warehousing and distribution employment in the Tigard area runs through buildings that were leased for a different tenant’s storage plan. We work inside those constraints, using selective rack for fast-moving pallets and adding density only where bay depth and sprinkler clearance allow. Warehouse storage systems in Tigard get sized to the building you have, not the one the layout template assumes.

Plumbing & Waterworks

Plumbing and waterworks supply is a documented part of this market, and that inventory is pipe, fittings, valves, and fixtures with almost nothing in common dimensionally. Cantilever racks and pipe storage racks in Tigard carry the long stock with forklift access from the aisle, while boltless shelving handles small parts and selective rack takes the palletized goods.

Government & Institutional Buyers

Public agencies and fire service operations are among the larger employers in Tigard, and their storage is fleet parts, equipment, and supplies held in buildings shared with vehicle bays. We design layouts that keep drive aisles clear for apparatus and service trucks, and we supply the stamped drawings and capacity documentation those buyers need for their own records.

We are Tigard’s largest pallet rack and material handling distributor!

What Pallet Rack type is right for you?

In Tigard, Oregon, the right racking system depends on your industry, throughput, and facility layout. Distribution operations near Highway 217 and trade supply houses handling pipe and fittings run very different storage, and the Washington County infill buildings they occupy limit how deep you can go. If you’re not sure which fits, that’s the conversation we want to have first.

Selective Pallet Racks

Selective Pallet Racks

The most common type of pallet racking system. It provides direct access to each pallet, making it suitable for warehouses with a wide variety of products.

Advantages

Flexibility, ease of access, and compatibility with most types of forklifts.

Compliance

Must meet structural and seismic requirements as outlined in the local building codes and ASCE 7 standards.

Advantages

Flexibility, ease of access, and compatibility with most types of forklifts.

Compliance

Must meet structural and seismic requirements as outlined in the local building codes and ASCE 7 standards.


Drive-In/Drive-Through Racks

Drive-In/Drive-Through Racks

Designed for high-density storage, allowing forklifts to drive directly into the rack to place or retrieve pallets. Drive-In racks have one entry and exit point, while Drive-Through racks have entry and exit points on both sides.

Advantages

Maximizes storage space by reducing aisle space.

Compliance

Requires careful design and anchorage to meet safety standards, especially in seismic zones​.

Advantages

Maximizes storage space by reducing aisle space.

Compliance

Requires careful design and anchorage to meet safety standards, especially in seismic zones​.


Push-Back Racks

Push-Back Racks

A high-density storage system where pallets are loaded from the front and pushed back on inclined rails. When a pallet is removed, the next pallet automatically moves forward.

Advantages

Increases storage density while providing better access to products compared to drive-in racks.

Compliance

Needs to adhere to local structural requirements and periodic inspections for safety​.

Advantages

Increases storage density while providing better access to products compared to drive-in racks.

Compliance

Needs to adhere to local structural requirements and periodic inspections for safety​.


Pallet Flow Racks

Pallet Flow Racks

Utilizes gravity flow lanes to move pallets from the loading side to the picking side. Ideal for first-in, first-out (FIFO) inventory management.

Advantages

Efficient for warehouses with high turnover rates and expiration-sensitive products.

Compliance

Requires detailed structural analysis and compliance with seismic bracing standards.

Advantages

Efficient for warehouses with high turnover rates and expiration-sensitive products.

Compliance

Requires detailed structural analysis and compliance with seismic bracing standards.

Designing Your Pallet Rack

Try our Pallet Rack Builder to design your system and get instant final pricing upon checkout.

Try Pallet Rack Builder
FAQ

Do you serve cities near Tigard as well as Tigard itself?

Yes. Our crews cover Washington County and the Portland metro from North Plains, including Tualatin, Sherwood, King City, Durham, and Beaverton.

How does Oregon’s building code affect racking in a Tigard warehouse?

It treats storage racks as structures, so ASCE 7 seismic provisions apply and every frame needs engineered anchorage into the slab. That anchorage detail is part of the permit submittal, not something decided during installation.

Can cantilever racks in Tigard be installed outdoors in the local climate?

Yes, with a concrete foundation and a finish specified for wet Willamette Valley winters. Blacktop will not hold a loaded cantilever rack, so outdoor installs here usually need a pour before steel arrives.

Key Notions

Pallet racks are known throughout the industry by many names. Below are some of the more common terms that are used interchangeably for pallet racking.

  • Industrial shelving
  • Industrial pallet racks
  • Stacking Rack
  • Warehouse shelving
  • Industrial racking systems
  • Load-bearing Rack
  • Warehouse racking systems
  • Pallet rack systems
  • Bulk Storage Rack
  • Warehouse racks
  • Pallet racking storage
  • Heavy-Duty Rack
  • Pallet racking
  • Pallet racking uprights and beams
  • Pallet Shelving
  • Warehouse racking
  • Industrial Rack
  • Logistics Rack
  • Warehouse pallet shelving rack
  • Racking System
  • Palletized Storage System
  • Storage racking
  • Shelving Unit
  • Freight Storage Rack
  • Warehouse storage racks
  • Material Handling Rack
Case Studies & Reviews See all case studies
  • rated

    5.0 ...............

  • reviews

    160+

Write a review

Irving Nieves says: “It's been an easy process working with the Speedrack West team, even with the changes partway through.”

Open full case study

Kyle Gersman says: “I called Bill multiple times a day and he always picked up and was always very helpful. What I really liked is that they pointed out a lot of questions and processes that I didn't even have on my radar going into the move. It helped me expand the scope to an appropriate size of what I needed to consider as we made the transition to a bigger facility.”

Open full case study

Robert Baumgartner says: “Despite picking up this project in the middle of its lifecycle, the transition was flawless thanks to the team’s stellar communication. They exceeded our expectations by delivering the installation earlier than anticipated and hitting every technical requirement. From the sales team’s quick answers to their willingness to make adjustments, the experience was top-tier.”

Open full case study

Consolidated Supply says: “We’re very happy to be your regular client, and it’s always so easy to work with your team”

Open full case study

Lumber Company says: “Working with Speedrack West team has been a real pleasure. They made the whole process smooth and straightforward, and we’re 100% planning to come back again—which we actually just did recently.”

Open full case study

Derek Patterson says: “I would suggest that there should be no hesitation…from placing an order to getting everything delivered in such a timely manner. I had racking within 7 days compared to 4 to 6 weeks elsewhere. The customer service level is fabulous.”

Open full case study

Need Warehouse Help in Tigard? Let’s Talk.

Subscribe

to our newsletter

STAY UPDATED

on deals & new products