We are proud of serving
Hillsboro, OR and the surrounding area

Pallet Racking Systems in Hillsboro, OR

Pallet rack systems for Hillsboro warehouses, from the Sunset Highway industrial corridor out to the western edge of Washington County. We draw the layout, run the permit package, and install with our own crews. Every system is engineered and anchored to Oregon's seismic standards. Pallet racking in Hillsboro, Oregon serves semiconductor suppliers, logistics operators, and scientific instrument makers, and each of those runs a different load profile.

or

Call us now:

503-640-5666
Brand Logo
Brand Logo
Brand Logo
Brand Logo
Brand Logo
Brand Logo
Brand Logo
Brand Logo
Brand Logo

Racking Delivery and Coverage in Hillsboro, OR

Most standard racking orders to Hillsboro can arrive in as little as

3–5 DAYS


Actual delivery times vary. Large projects, structural systems, and permit-tied orders may take longer. We ship from multiple U.S. locations – once we see your scope, we’ll give you a real lead time.

Warehouse Racking Services in Forest Grove, OR

Safety Inspection

Design Standard

ANSI MH16.1

Tag System

Green, Yellow, Red

Rack in Hillsboro’s high-turnover distribution buildings takes forklift contact daily, and damage shows up first at the base of the upright. Our inspectors walk columns, anchor plates, struts, beams, and frames section by section, then tag each one green, yellow, or red. You get the findings in writing with the replacement parts listed against each tagged section. Forklifts keep running while we work, so nothing stops on the floor.

Installation

Anchoring Spec

ASCE 7 Loads

Coverage

Washington County, OR

Pallet rack installation in Hillsboro happens on live warehouse floors, scheduled around your shipping and production windows. Our crew anchors every upright to the spacing shown on the stamped drawings, and slab thickness gets verified before anchors are selected. Tear-down of existing rack runs in the same visit when the layout changes. A 750,000 sq ft logistics building and a 5,000 sq ft shop get the same anchoring standard.

Permits

Local Authority

Hillsboro Development & Permitting

Design Code

2022 Oregon OSSC

We assemble the submittal package for your Hillsboro site: rack layout, elevations, load data, and stamped engineering. Our engineer calculates anchorage and frame capacity for the actual site and pallet weights before anything goes to the counter. We answer plan review comments directly instead of routing them back to you. The goal is approval on the first submittal, not a second round.

Warehouse Racking Built for Hillsboro’s Silicon Forest

Warehouse Racking Built for Hillsboro's Silicon Forest

Warehouse Racking Built for Hillsboro’s Silicon Forest

Hillsboro sits at the center of Oregon’s semiconductor cluster, and the supplier and logistics buildings around it move small, high-value parts on tight schedules. We size warehouse racking in Hillsboro for that mix, not for a generic distribution template.

A 750,000-square-foot logistics facility broke ground here to serve Oregon’s semiconductor industry, and buildings at that scale change the math on aisle width and pallet positions. We stock pallet racks, decking, and warehouse shelving for Hillsboro operations and ship standard orders in 3-5 days.

Our crews handle pallet rack work across Washington County, Oregon, from Forest Grove and Cornelius east to Beaverton and Tualatin. The same team that draws your layout is the one anchoring the steel.

Requirements and Regulations Specific to Racking in Hillsboro, OR

Requirements and Regulations Specific to Racking in Hillsboro, OR

Are racking permits required in Hillsboro, Oregon?

Yes. Rack installations are permitted through the City of Hillsboro, and the 2022 Oregon Structural Specialty Code sets the structural and seismic bar the drawings have to clear. Put stamped engineering in the project schedule at the start, not after the steel is on the dock.

Who You'll Work With

Building permits for racking inside city limits go through the City of Hillsboro Development & Permitting Team. Sites outside city limits fall to Washington County. High-piled combustible storage adds a fire review, and the Hillsboro threshold and submittal path for that review are triggered when storage exceeds 12 feet in height for normal commodities (or 6 feet for high-hazard commodities like lithium-ion batteries or certain plastics), within a footprint of more than 500 square feet. The submittal path requires an online application through the City of Hillsboro Permit Portal, where applicants must upload detailed engineering drawings, commodity classification data (per NFPA 13), and fire sprinkler design plans for joint evaluation by the Building Department and Hillsboro Fire & Rescue.

Why This Matters for Hillsboro Operations

The 8-foot height line in the 2022 Oregon Structural Specialty Code decides whether your rack carries a special inspection requirement, and most warehouse rack clears that height. Budget the engineering and inspection time up front. Finding it at install is what turns a short project into a stalled one, especially in a leased building where the landlord also has to sign off.

Key Requirements

  • Permit Requirement:

    A building permit is required for pallet racking installations in Hillsboro. Steel storage racks are regulated as structures under the 2022 Oregon Structural Specialty Code, which means the drawings carry load data and anchorage detail, not just a floor plan.

  • Application:

    Submittals for sites inside city limits go to the City of Hillsboro Development & Permitting Team. Projects on land outside city limits are handled by Washington County.

  • Seismic Design Category:

    Section 1705.13.7 of the 2022 Oregon Structural Specialty Code calls out steel storage racks and steel cantilevered racks 8 feet in height or greater that are assigned to Seismic Design Category D. The category is set per address from site class and soil conditions, so it is confirmed for your building rather than assumed from the city.

  • Engineering:

    Frame capacity and base anchorage are calculated to ASCE 7 design loads for the assigned category. The City of Hillsboro Building Division has enforced seismic design standards on new construction and alterations since 1974, so plan reviewers here expect the calculations to be complete on the first pass.

  • High-Piled Combustible Storage:

    In Hillsboro, a specific permit is required under the Oregon Fire Code when combustible materials are stored over 12 feet in height (or 6 feet for high-hazard commodities like plastics, tires, or lithium batteries) across an area exceeding 500 square feet. The application must be submitted to Hillsboro Fire & Rescue via the city’s Permit Portal and include a detailed floor plan, commodity classification matrix, exact storage heights, and structural engineering calculations (including seismic design, as this region requires specific earthquake bracing).

  • Sprinkler Coordination:

    Rack row layout, transverse and longitudinal flue spaces, and decking type all have to match the building’s existing sprinkler design before the layout is final. The specific Hillsboro fire review thresholds and submittal requirements are triggered automatically for any racking system categorized as high-piled storage (12+ feet). Submittals must be routed through the City of Hillsboro Permit Portal and require a fire protection plan reviewed by an Oregon-licensed fire protection contractor or engineer. This submittal must strictly verify that flue spaces (typically requiring a 6-inch minimum longitudinal flue), ceiling clearances, and solid decking limits comply with NFPA 13 and Hillsboro Fire & Rescue standards, to determine whether the existing ceiling sprinklers are adequate or if in-rack sprinklers must be added.

  • Load Capacity:

    Beam and upright capacity is specified per level against the actual pallet weight and loading pattern, following ANSI MH16.1 design practice. Rated capacity is posted on the system so operators are not estimating at the fork.

  • Anchoring:

    Every upright is anchored to the slab at the spacing shown on the stamped drawings. Slab thickness and condition are verified on site before anchor type and embedment are selected, since an anchor rated for 6 inches of concrete does nothing in 4 inches.

  • General Duty Clause:

    OSHA’s General Duty Clause requires employers to provide a workplace free of recognized hazards. A bent upright or a missing safety clip in an active aisle is a recognized hazard, and it is what an inspector looks at first.

  • Ongoing Compliance:

    Posted load capacity labels, documented inspections, and repair records are the paperwork that gets requested during an inspection. We leave written documentation after every walkthrough so the file is current.

  • Pre-Install Engineering Review:

    Before any steel ships, our team audits your order against your site dimensions, forklift class, and pallet specs. We catch specification errors before they leave our facility – and we document everything so your receiving team knows exactly what to expect at the dock.

  • Post-Install Verification:

    After install, our crew checks anchor placement, beam engagement, and plumb against the approved drawings, then confirms the posted capacity matches what was engineered. Anything out of tolerance is corrected before the first pallet goes in.

  • Zoning Compliance:

    Interior rack in an existing Hillsboro warehouse rarely changes zoning status. Outdoor racking, added mezzanine floor area, or a change in how the building is used can pull a zoning review at the City of Hillsboro alongside the building permit.

  • Site-Specific Checks:

    Occupancy classification and approved use are checked against the proposed storage before submittal. In Washington County’s industrial parks, tenant improvements in multi-tenant buildings are the common place where the approved use and the actual storage plan drift apart.

Racking for the Industries That Run Hillsboro

Hillsboro’s warehouse demand comes from three directions: semiconductor manufacturing and its supply chain, the logistics buildings that feed it, and the scientific instrument makers clustered around them. Each stores a different shape of product.

Electrical, Power & Low-Voltage

Hillsboro’s semiconductor and electronics manufacturers and their component suppliers store small, high-value parts in mixed case and pallet quantities. We configure selective pallet rack for the palletized side and pair it with warehouse shelving for case picking, so one room handles both instead of splitting inventory across buildings on opposite sides of town.

Logistics & Other Distribution

A 750,000-square-foot logistics facility broke ground in Hillsboro specifically to serve Oregon’s semiconductor industry, and buildings at that scale live on pallet-position count and clean forklift travel paths. We lay out selective, double-deep, and pushback systems for third-party logistics and distribution operators across Washington County, sized to the forklift class already on the floor.

Medical, Lab & Scientific Manufacturing

Scientific instrument and lab equipment manufacturers in Hillsboro stage subassemblies and finished units that are heavy, awkward, and easy to damage. Racking for that product is specified around the actual crate and skid dimensions, with beam levels set to the real footprint and decking chosen so nothing bridges two rails and flexes under load.

We are Hillsboro’s largest pallet rack and material handling distributor!

What Pallet Rack type is right for you?

In Hillsboro, Oregon, the right racking system depends on your industry, throughput, and facility layout. Semiconductor suppliers, third-party logistics operators, and scientific instrument manufacturers across Washington County each run different load profiles and pick rates. If you are not sure which fits, that is the conversation we want to have first.

Selective Pallet Racks

Selective Pallet Racks

The most common type of pallet racking system. It provides direct access to each pallet, making it suitable for warehouses with a wide variety of products.

Advantages

Flexibility, ease of access, and compatibility with most types of forklifts.

Compliance

Must meet structural and seismic requirements as outlined in the local building codes and ASCE 7 standards.

Advantages

Flexibility, ease of access, and compatibility with most types of forklifts.

Compliance

Must meet structural and seismic requirements as outlined in the local building codes and ASCE 7 standards.


Drive-In/Drive-Through Racks

Drive-In/Drive-Through Racks

Designed for high-density storage, allowing forklifts to drive directly into the rack to place or retrieve pallets. Drive-In racks have one entry and exit point, while Drive-Through racks have entry and exit points on both sides.

Advantages

Maximizes storage space by reducing aisle space.

Compliance

Requires careful design and anchorage to meet safety standards, especially in seismic zones​.

Advantages

Maximizes storage space by reducing aisle space.

Compliance

Requires careful design and anchorage to meet safety standards, especially in seismic zones​.


Push-Back Racks

Push-Back Racks

A high-density storage system where pallets are loaded from the front and pushed back on inclined rails. When a pallet is removed, the next pallet automatically moves forward.

Advantages

Increases storage density while providing better access to products compared to drive-in racks.

Compliance

Needs to adhere to local structural requirements and periodic inspections for safety​.

Advantages

Increases storage density while providing better access to products compared to drive-in racks.

Compliance

Needs to adhere to local structural requirements and periodic inspections for safety​.


Pallet Flow Racks

Pallet Flow Racks

Utilizes gravity flow lanes to move pallets from the loading side to the picking side. Ideal for first-in, first-out (FIFO) inventory management.

Advantages

Efficient for warehouses with high turnover rates and expiration-sensitive products.

Compliance

Requires detailed structural analysis and compliance with seismic bracing standards.

Advantages

Efficient for warehouses with high turnover rates and expiration-sensitive products.

Compliance

Requires detailed structural analysis and compliance with seismic bracing standards.

Ready to Start Designing Your Pallet Rack?

Use our Pallet Rack Builder to configure your system online.

Try Pallet Rack Builder
FAQ

Do you serve warehouses in Washington County outside Hillsboro?

Yes. Our crews cover Washington County, Oregon, including Forest Grove, Cornelius, Beaverton, Tigard, and Tualatin.

How does Oregon’s building code affect rack height in a Hillsboro warehouse?

Section 1705.13.7 of the 2022 Oregon Structural Specialty Code flags steel storage racks 8 feet and taller assigned to Seismic Design Category D. Most warehouse rack in this area clears that height, so plan on stamped engineering from the start.

How does Oregon’s seismic code change the way racks are anchored here?

Anchorage is calculated to ASCE 7 design loads as adopted by the Oregon Structural Specialty Code, not set from a standard bolt pattern. Slab thickness and condition are verified on site before the anchor type is selected.

Key Notions

Pallet racks are known throughout the industry by many names. Below are some of the more common terms that are used interchangeably for pallet racking.

  • Industrial shelving
  • Industrial pallet racks
  • Stacking Rack
  • Warehouse shelving
  • Industrial racking systems
  • Load-bearing Rack
  • Warehouse racking systems
  • Pallet rack systems
  • Bulk Storage Rack
  • Warehouse racks
  • Pallet racking storage
  • Heavy-Duty Rack
  • Pallet racking
  • Pallet racking uprights and beams
  • Pallet Shelving
  • Warehouse racking
  • Industrial Rack
  • Logistics Rack
  • Warehouse pallet shelving rack
  • Racking System
  • Palletized Storage System
  • Storage racking
  • Shelving Unit
  • Freight Storage Rack
  • Warehouse storage racks
  • Material Handling Rack
Case Studies & Reviews See all case studies
  • rated

    5.0 ...............

  • reviews

    160+

Write a review

Irving Nieves says: “It's been an easy process working with the Speedrack West team, even with the changes partway through.”

Open full case study

Kyle Gersman says: “I called Bill multiple times a day and he always picked up and was always very helpful. What I really liked is that they pointed out a lot of questions and processes that I didn't even have on my radar going into the move. It helped me expand the scope to an appropriate size of what I needed to consider as we made the transition to a bigger facility.”

Open full case study

Robert Baumgartner says: “Despite picking up this project in the middle of its lifecycle, the transition was flawless thanks to the team’s stellar communication. They exceeded our expectations by delivering the installation earlier than anticipated and hitting every technical requirement. From the sales team’s quick answers to their willingness to make adjustments, the experience was top-tier.”

Open full case study

Consolidated Supply says: “We’re very happy to be your regular client, and it’s always so easy to work with your team”

Open full case study

Lumber Company says: “Working with Speedrack West team has been a real pleasure. They made the whole process smooth and straightforward, and we’re 100% planning to come back again—which we actually just did recently.”

Open full case study

Derek Patterson says: “I would suggest that there should be no hesitation…from placing an order to getting everything delivered in such a timely manner. I had racking within 7 days compared to 4 to 6 weeks elsewhere. The customer service level is fabulous.”

Open full case study

Need Warehouse Help in Hillsboro? Let’s Talk.

Subscribe

to our newsletter

STAY UPDATED

on deals & new products