Dallas, TX and the surrounding area
Pallet Racking in Dallas, TX
Speedrack West supplies and installs pallet racking in Dallas, TX, from a few replacement bays to a full distribution center build. We cover Dallas proper and the metro around it: Garland, Mesquite, Irving, Grand Prairie, and the industrial corridors running south and east of the city. New and used pallet racks, pushback, pallet flow, cantilever, and structural systems, drawn to Texas seismic and anchorage engineering and sealed before anything ships.
Racking Delivery and Services in Dallas, TX
Most standard racking orders to Dallas can arrive in as little as
5–7 DAYS
Actual delivery times vary. Large projects, structural systems, and permit-tied orders may take longer. We ship from multiple U.S. locations – once we see your scope, we’ll give you a real lead time.
Services We Run in Dallas
Inspection Standard
ANSI MH16.1
Oversight
Federal OSHA Jurisdiction
Our inspectors walk your Dallas racking row by row and tag every upright, beam, baseplate, and anchor green, yellow, or red. Damage gets photographed and logged by bay location, with a repair-or-replace call on each item so your team knows what to pull out of service first. In high-turnover Dallas distribution buildings the repeat findings are forklift-struck columns, bent front beams, and missing safety clips. You leave with a written record, which is what a compliance officer asks for after a near miss.
Anchorage Design
ASCE 7-16 Chapter 15
Rack Provision
IBC 2021 Section 2209
Our crews set frames, anchor every upright to the slab, and set beam elevations to the approved drawings, then walk the finished rows with your team. We schedule around live operations, which matters in Dallas buildings running second and third shifts through the Interstate 20 and Interstate 35E corridors. Teardown, relocation, and reconfiguration of racking you already own fall under the same scope. Pallet rack installation in Dallas is handled by our own crews, not brokered to a third party.
Local Authority
Dallas Planning and Development
Fire Review
Dallas Fire-Rescue
We build the submittal package: rack elevations, load plan, anchorage details, and the seal of a Texas licensed professional engineer. When storage height crosses the high-piled threshold we prepare the fire submittal alongside it, covering commodity classification, tier counts, flue spaces, and clearance to sprinkler deflectors. We file the package, track the review, and answer plan-review comments so the project does not sit in a queue. One package, one point of contact, instead of three vendors pointing at each other.
Shop Our Products
Discover
300+
products
Requirements and Regulations Specific to Racking in Dallas, TX
Yes. The City of Dallas requires a building permit and engineered plans for racking installations, and storage above 12 feet also pulls in a high-piled combustible storage permit on the fire side. Both reviews run on their own clock, so the sequence to plan around is engineering first, submittal second, steel scheduled last.
Who You'll Work With
Why This Matters for Dallas Operations
Key Requirements
-
Permit Requirement:
A building permit with engineered plans is required for pallet racking installations in Dallas. The city’s position is that racking systems may only be installed under a permit, and storage above 12 feet is additionally treated as high-piled storage.
-
Application:
Submittals go to the City of Dallas Planning and Development Department, which took over building permitting in June 2024 when Development Services merged with Planning and Urban Design. Plans, load calculations, and anchorage details are submitted as one commercial package.
-
Seismic Design Category:
There is no single Seismic Design Category for Dallas. It is assigned under ASCE 7 from the mapped ground motion at your address, the site class, and the risk category of the building, so the engineer of record determines it per site. Chapter 53 of the Dallas City Code adopts the 2021 International Building Code, effective May 12, 2023, and that code references ASCE 7-16 for earthquake loads.
-
Engineering:
Steel storage rack design and anchorage run through IBC Section 2209, which points to the ANSI MH16.1 rack standard and to ASCE 7 Chapter 15 for nonbuilding structures. North Texas ground motion is low next to the West Coast, but the calculation still has to be run, sealed, and submitted rather than assumed. Under the Texas Engineering Practice Act, Section 1001.401, a plan or specification issued for a project built in Texas carries the licensed engineer’s seal.
-
High-Piled Combustible Storage:
Chapter 16 of the Dallas City Code adopts the 2021 International Fire Code, including Chapter 32 on high-piled combustible storage. The trigger is storage above 12 feet, and under the fire code definition high-hazard commodities such as Group A plastics, rubber tires, flammable liquids, and idle pallets can trigger it above 6 feet. Dallas Fire-Rescue reviews and issues fire code permits on the storage side.
-
Sprinkler Coordination:
The Chapter 32 submittal has to show the high-piled storage areas and dimensions, usable storage height, number of tiers per rack, commodity classification, fire department access doors, and the control valves for ceiling and in-rack sprinklers. Clearance between the top of storage and the sprinkler deflector is part of that package, which is why rack elevations and sprinkler design have to be settled together. Raising beam levels after approval usually means going back for another review.
-
Load Capacity:
Beam and frame capacities come from test-based manufacturer ratings developed under ANSI MH16.1. They are tied to beam length, frame depth, column gauge, and the vertical beam spacing you actually install, so moving a beam level down changes the rated capacity of the bay. Capacity labels have to reflect the configuration in the building, not the one on the original quote.
-
Anchoring:
Every upright is anchored to the slab, and the anchor type, diameter, and embedment come out of the engineering rather than a catalog default. Slab thickness, reinforcement, and control joint locations often drive the baseplate and anchor detail as much as the rack load does. On existing Dallas buildings, confirming the slab before the layout is fixed avoids a redesign after the drawings are sealed.
-
General Duty Clause:
Texas has no OSHA-approved state plan, so private-sector warehouses in Dallas fall under federal OSHA. There is no rack-specific OSHA standard, which means racking enforcement runs through the General Duty Clause, Section 5(a)(1) of the OSH Act, along with 29 CFR 1910.176(b) on secure stacking and storage of material.
-
Ongoing Compliance:
Post load capacities, keep damaged frames out of service until they are repaired or replaced, and write the inspections down. A dated record showing what was found, what was tagged, and what was corrected is what a compliance officer asks for after a near miss or a collapse.
-
Pre-Install Engineering Review:
Before any steel ships, our team audits your order against your site dimensions, forklift class, and pallet specs. We catch specification errors before they leave our facility – and we document everything so your receiving team knows exactly what to expect at the dock.
-
Post-Install Verification:
After install we walk the system with your team: anchor count and torque, beam connector locks and safety clips, plumb and level tolerance, and capacity labels posted at the bay. Anything flagged during plan review gets checked on that same pass, so the city or fire inspection is not the first time it is looked at.
-
Zoning Compliance:
Dallas is a fully zoned city under Chapter 51A of the Dallas Development Code. Warehouse and industrial use sits in the districts the code defines as industrial: LI, IR, and IM. Racking inside an existing conforming warehouse is normally a building and fire question rather than a zoning one.
-
Site-Specific Checks:
Confirm the parcel’s district and any planned development district or overlay conditions before the layout is set, since outdoor storage, screening, and height conditions vary parcel to parcel in Dallas. Outdoor cantilever or yard storage is where zoning conditions bite hardest. A change of use or occupancy class can pull a certificate of occupancy review in alongside the rack permit.
Racking for the Industries Running Dallas Warehouses
No single sector dominates the Dallas economy, and the racking reflects that. These three come up most often in the buildings we work in across the metro.
Logistics & Other Distribution
Retail, Ecommerce & Consumer Goods
Heavy Industry & Fabrication
We are Dallas’s largest pallet rack and material handling distributor!
What Pallet Rack type is right for you?
In Dallas, Texas, the right racking system depends on your industry, throughput, and facility layout. Third-party logistics and fulfillment buildings along the Interstate 20 and Interstate 35E corridors move high SKU counts fast, while the region’s aerospace, electronics, and food processing plants hold heavier and slower-moving stock. We carry pallet racks for sale in Dallas in both new and used condition, and which configuration fits is the conversation we want to have before you buy.
Selective Pallet Racks
The most common type of pallet racking system. It provides direct access to each pallet, making it suitable for warehouses with a wide variety of products.
Advantages
Flexibility, ease of access, and compatibility with most types of forklifts.
Compliance
Must meet structural and seismic requirements as outlined in the local building codes and ASCE 7 standards.
Advantages
Flexibility, ease of access, and compatibility with most types of forklifts.
Compliance
Must meet structural and seismic requirements as outlined in the local building codes and ASCE 7 standards.
Drive-In/Drive-Through Racks
Designed for high-density storage, allowing forklifts to drive directly into the rack to place or retrieve pallets. Drive-In racks have one entry and exit point, while Drive-Through racks have entry and exit points on both sides.
Advantages
Maximizes storage space by reducing aisle space.
Compliance
Requires careful design and anchorage to meet safety standards, especially in seismic zones.
Advantages
Maximizes storage space by reducing aisle space.
Compliance
Requires careful design and anchorage to meet safety standards, especially in seismic zones.
Push-Back Racks
A high-density storage system where pallets are loaded from the front and pushed back on inclined rails. When a pallet is removed, the next pallet automatically moves forward.
Advantages
Increases storage density while providing better access to products compared to drive-in racks.
Compliance
Needs to adhere to local structural requirements and periodic inspections for safety.
Advantages
Increases storage density while providing better access to products compared to drive-in racks.
Compliance
Needs to adhere to local structural requirements and periodic inspections for safety.
Pallet Flow Racks
Utilizes gravity flow lanes to move pallets from the loading side to the picking side. Ideal for first-in, first-out (FIFO) inventory management.
Advantages
Efficient for warehouses with high turnover rates and expiration-sensitive products.
Compliance
Requires detailed structural analysis and compliance with seismic bracing standards.
Advantages
Efficient for warehouses with high turnover rates and expiration-sensitive products.
Compliance
Requires detailed structural analysis and compliance with seismic bracing standards.
Designing Your Pallet Rack
Try our Pallet Rack Builder to design your system and get instant final pricing upon checkout.
Try Pallet Rack BuilderDo you serve warehouses outside Dallas city limits across the Fort Worth metro?
Yes. We cover Dallas Fort Worth, including Irving, Garland, Mesquite, Grand Prairie, and Arlington, and we ship across Texas from multiple U.S. locations.
Are used pallet racks available for a Dallas warehouse?
Yes, used pallet racks are one of the options we offer in Dallas alongside new systems. What is available depends on the sizes and capacities in stock when you order.
How does the low North Texas seismic hazard affect pallet rack installation in Dallas?
It lowers the design forces, but it does not remove the requirement: the Dallas Building Code adopts the 2021 IBC and ASCE 7-16, so anchorage still has to be engineered and sealed. Seismic Design Category is set by your site address and soil conditions, not by the city as a whole.
Key Notions
Pallet racks are known throughout the industry by many names. Below are some of the more common terms that are used interchangeably for pallet racking.
- Industrial shelving
- Industrial pallet racks
- Stacking Rack
- Warehouse shelving
- Industrial racking systems
- Load-bearing Rack
- Warehouse racking systems
- Pallet rack systems
- Bulk Storage Rack
- Warehouse racks
- Pallet racking storage
- Heavy-Duty Rack
- Pallet racking
- Pallet racking uprights and beams
- Pallet Shelving
- Warehouse racking
- Industrial Rack
- Logistics Rack
- Warehouse pallet shelving rack
- Racking System
- Palletized Storage System
- Storage racking
- Shelving Unit
- Freight Storage Rack
- Warehouse storage racks
- Material Handling Rack
Need Warehouse Help in Dallas? Let’s Talk.











































