The Main Problems that Speedrack West had Solved

The Main Problems that Speedrack West had Solved

  • WEATHER PROTECTION WITHOUT A SEPARATE BUILDING

    Both systems were engineered with built-in roof structures, an 8-foot overhang on Phase 1, and roof trusses on Phase 2, so lumber stays dry without losing yard space to a standalone structure.

  • STORAGE THAT SCALES WITH THE YARD

    When the first section filled up, Speedrack West came back and built out a second. The yard didn't have to start over; it just expanded.

  • TWO DIFFERENT SYSTEMS, ONE CONSISTENT APPROACH

    Phase 1 and Phase 2 use different heights and configurations because different sections of the yard have different needs. Both are structural, both weather-protected, both built for forklift access.

  • DESIGNED FOR THE SITE, NOT A CATALOG SPEC

    Built the system around this yard's specific weather and space constraints rather than a standard off-the-shelf configuration.

Before
Before
Arrow
After
After
The Main Problems that Speedrack West had Solved

The Main Problems that Speedrack West had Solved

  • Counseled

    about the OSHA inspection

  • Saved

    our client's time and resources

  • Supplied

    the materials and coordinated the delivery

  • Increased

    storage capacity