Before

After

Before

After


Be sure to watch our latest video interview where the client shares the vision about the project we supported at Speedrack West!



Both systems were engineered with built-in roof structures, an 8-foot overhang on Phase 1, and roof trusses on Phase 2, so lumber stays dry without losing yard space to a standalone structure.
When the first section filled up, Speedrack West came back and built out a second. The yard didn't have to start over; it just expanded.
Phase 1 and Phase 2 use different heights and configurations because different sections of the yard have different needs. Both are structural, both weather-protected, both built for forklift access.
Built the system around this yard's specific weather and space constraints rather than a standard off-the-shelf configuration.



about the OSHA inspection
our client's time and resources
the materials and coordinated the delivery
storage capacity

Be sure to watch our latest video interview where the client shares the vision about the project we supported at Speedrack West!