Before

After


The Main Problems that Speedrack West had Solved
- ENGINEERED A CUSTOM LAYOUT
Designed a specific floor plan to move chaotic inventory off the ground and into a structured, organized system.
- SUPPLIED EXACT-SPEC RACKING
Sourced and delivered the correct small-part racking to replace the underutilized pallet system that wasn't working.
- COMPLETED A 5-DAY INSTALLATION
Installed the complete system from tear-down to cleanup faster than anticipated, minimizing facility downtime.
- ELIMINATED SAFETY RISKS
Secured the workflow with punched decking and safety netting, ensuring 100% compliance and worker protection.











































